The “Green Pastures” – “Green Power Projects” Dilemma

09 Mai 2022   |   Mihaela Nyerges, Partner Vlăsceanu, Nyerges & Partners

In the pursuit of suitable lands, pastures have entered the close attention of developers.

 
 
Romania has a high potential of renewable energy sources (RES) distributed on its entire territory. Nevertheless, when selecting the location of a E-RES generation project, multiple criteria must be used such as distance to the grid, availability of grid capacity, absence of technical or urbanism limitations.

In the pursuit of suitable lands, pastures have entered the close attention of developers.

Romania has more than 4 million pastures, many of which strategically located. However, the vast majority of Romanian pastures are extra murros land, which triggers the application of a very strict legal regime. The purpose thereof is to ensure that the total surface of pastures inventoried in July 2007 is not being diminished.

According to Government Emergency Ordinance no. 34/2013 on the organization, administration and operation of permanent pastures and for amending and supplementing the Land Law no. 18/1991 (Pastures Ordinance”), the pastures located extra murros may be used only for animal grazing and fodder production.

By exception, the extra murros pastures may be used for building specific types of constructions among which the E-RES generation capacities. Nevertheless, the development of E-RES projects on extra-murros pastures is subject to specific mandatory requirements that, in practice, prove to be deadlocks.  

According to Pastures Ordinance, such requirements are the following:

(i)              the E-RES projects must not affect the good exploitation of the pastures; and

(ii)           the developer must recover from the non-productive lands an area equal to that of the pasture which is removed from the agricultural circuit.

On one hand, the 2 conditions seem to overlap. We do not see the rationale for which the E-RES capacities should not affect the good exploitation of the pastures if a corresponding area of non-productive land is to be recovered to account for the respective pasture.

In addition, from a practical perspective, non-productive land is extremely hard to find. As result, considering the big surface of land needed for developing a solar project, the land recovering requirement ultimately makes ineffective the right to develop such projects on pastures.

A practical solution for ensuring the coexistence between solar projects and pastures is to install higher pillars that would allow animal grazing and fodder production under the panels. Under such a scenario, it should be sufficient to remove from agricultural circuit and, therefore, to recover from non-productive land only the area covered by specific segments of the photovoltaic park (such as pillars and transformer substation), as such would be the only area that becomes unexploitable as pasture.

Nevertheless, the above solution should be deemed acceptable by the Ministry of Agricultural and Rural Development, as such authority should favorably endorse the removal of the pastures from the agricultural circuit (for areas below 100 ha).

Another solution could come from a draft of law that is currently on the agenda of the Deputies Chamber. According to such draft, it is allowed to build E-RES projects on extra murros land, including pastures, to the extent not exceeding 50 ha. If such law is approved (and wording slightly clarified and corelated to existing legislation), not only that the harsh requirements imposed by Pastures Ordinance would no longer be applicable, but no PUZ would be needed for developing E-RES projects on extra murros pastures. Such would considerably speed up the development process.

While Romanian lawmaker and authorities continue to be puzzled by the “green pastures” – “green power projects” dilemma, more and more studies and countries support the development of agrivoltaic projects, and numerous such projects are being implemented worldwide. We can only hope for a favorable solution that would give a boost to E-RES development in Romania.  

 
 

PNSA

 
 

ARTICOLE PE ACEEASI TEMA

ARTICOLE DE ACELASI AUTOR


     

    Ascunde Reclama
     
     

    POSTEAZA UN COMENTARIU


    Nume *
    Email (nu va fi publicat) *
    Comentariu *
    Cod de securitate*







    * campuri obligatorii


    Articol 1185 / 4522
     

    Ascunde Reclama
     
    BREAKING NEWS
    ESENTIAL
    BRD coordonează un club loan de 190 mil. € pentru NE Property BV. Avocații CMS au consiliat consorțiul bancar în această finanțare
    Women Lawyers | Din vorbă în vorbă cu Andreea Mihalache, Partener în cadrul firmei Popescu & Asociații, profesionist reputat, cu aproape 30 de ani de experiență ca avocat litigant la cel mai înalt nivel: ”Dincolo de oportunitatea de a lucra la dosare complexe, am și sprijinul unei echipe unite, ceea ce face ca fiecare provocare să fie o oportunitate de învățare și evoluție profesională”
    LegiTeam | Mitel & Asociații recrutează avocat cu experiență (Litigii și Soluționare a Disputelor)
    Cine sunt campionii pieței locale evidențiați în ultimul clasament IP Stars 2025 | Baciu Partners are cele mai multe recomandări în prima bandă din domeniul mărcilor. ZRVP și Dincă & Speciac sunt pe primul palier al performanței, urmate de Mușat & Asociații și NNDKP
    LegiTeam: Lawyer - Corporate M&A | Reff & Associates
    Kinstellar asistă Special Flanges pe toate aspectele, tranzacționale și de taxe, în achiziția producătorului industrial român Vilmar SA, cu o echipă pluridisciplinară coordonată de Zsuzsa Csiki (Partener, Co-Head of Corporate M&A) | Skadden, Simmons&Simmons și alte două firme de avocați din România au fost de o parte și de alta în această tranzacție
    CMS, alături de Bitdefender la achiziția Mesh Security | Horea Popescu (Managing Partner CMS România) și Mircea Moraru (Senior Counsel), în echipa multidisciplinară coordonată de la Londra, care a oferit consultanță cumpărătorului în toate aspectele tranzacției supusă acum aprobărilor din partea autorităților de reglementare
    “Schimbare” este cuvântul de ordine pe piața muncii, spun avocații de Employment de la Mușat & Asociații, fenomenul fiind potențat de avansul tehnologic rapid, evoluția așteptărilor angajaților și necesitatea adaptării la noile realități economice și sociale | Echipa gestionează un număr mare de proiecte care implică restructurări ample ale companiilor multinaționale, creşterea numărului de litigii fiind evidențiată în analiza tendințelor observate. De vorbă cu membrii echipei despre mandatele strategice încredințate de companii lideri în industrii variate și provocările anului 2025
    CMS își consolidează echipa din România prin promovarea a șapte avocați | Horea Popescu, managing partner CMS România: ”Aceste promovări reflectă nu doar calitatea muncii lor, ci și energia și dedicarea cu care aduc rezultate remarcabile clienților noștri și ne poziționează perfect pentru a ne continua creșterea și dezvoltarea competențelor”
    O gamă variată de mandate pentru avocații de Employment de la Mitel & Asociații | Schimbările din zona legislației muncii și noile tendințe în politica de personal, analizate de Mădălina Mitel (Partener) și Cristina Dan (Counsel)
    LegiTeam | Mitel & Asociații recrutează avocat definitiv (Drept Societar și Comercial)
    LegiTeam | Mitel & Asociații recrutează avocat definitiv (Real Estate)
     
    Citeste pe SeeNews Digital Network
    • BizBanker

    • BizLeader

        in curand...
    • SeeNews

      in curand...