Developing Renewables in Romania: PUZ or Pass?

17 Octombrie 2022   |   Mihaela Nyerges, Partener - Vlăsceanu, Nyerges & Partners

The practice of the authorities seems to differ: there are local authorities that request a PUZ for the issuance of the building permit, and authorities that no longer impose such an obligation through the urban planning certificate.

 
 

One of the most frequent questions asked there days by renewables investors and developers is whether PUZ is still required for developing small renewable power projects in Romania (below 50 ha). The relevance of this question is huge as the answer impacts on the duration of the development process with up to 9 months.

To answer, brief preliminary comments should be made regarding the general construction permitting rules, depending on the various types of lands.

1.          Types of lands

The following lands qualifications are relevant for the current topic:

(i)         from the perspective of their location, the lands can be (a) located intra-muros (within the buildable perimeter of the respective territorial administrative unit) or (b) located extra-muros (outside such perimeter);

(ii)       from the perspective of their destination, the lands can be, among others, (a) agricultural lands or (b) yards-constructions lands;

(iii)      from the perspective of their fertility class, the agricultural lands are split into 5 fertility classes, ranging from very fertile land (Class I) to very low fertile land (Class V); the fertility class is established based soil analysis made by experts within the county Office of Pedological Studies.

2.          General construction rule

As a general rule, all constructions may be erected only on lands (i) located intra-muros and (ii) qualifying as “yards-constructions”.

If the targeted land qualifies as extra-muros and agricultural land (which is typically the case with the land suitable for renewable projects),

(i)         the land should be first requalified from extra-muros into intra-muros land by means of a PUZ;

(ii)       no additional formalities should be done for converting the land from agricultural land to “yards-construction” land, as such conversion occurs automatically through the issuance of the building permit.

3.          Exception dedicated to renewable energy projects

Late July this year, an exception from the above rule was adopted, expressly allowing the construction of renewable power generation projects on extra-murros lands if the following conditions are met:

(i)         land has fertility class III, IV and V; and

(ii)       land does not exceed 50 ha.

Therefore, projects falling within the above limitations no longer need to obtain requalification of the land from extra-muros to intra-murros land through a PUZ.

4.          Need of a PUZ in case of renewable projects below 50 ha

Therefore, do we still need or not a PUZ for developing renewable on land with fertility class III, IV and V which does not exceeds 50 ha?

The practice of the authorities seems to differ: there are local authorities that request a PUZ for the issuance of the building permit, and authorities that no longer impose such an obligation through the urban planning certificate. We have also encountered a case where the authority changed its mind after having issued an urban planning certificate whereby no PUZ was requested.

Nevertheless, it should be mentioned that PUZ has multiple roles, not just the introduction of land into intra-murros area, as explained below:

(i)            according to the general construction law (with certain exceptions not applicable hereto), the building permit may be issued only if (a) there is an urban documentation approved regarding the respective land, setting out the legal, technical and economical regime of the land and (b) the envisaged construction is compatible with the rules set out by the respective urban documentation;

(ii)          all communes and towns in Romania must have an urban documentation approved – namely a general urban plan (“PUG”) adopted by the local authorities setting out (a) the function of each land (such as residential, industrial etc.) and (b) the applicable urbanism parameters and limitations (such as land occupation percentage, land occupation coefficient, height regime, etc.);

(iii)        PUG is a sufficient urbanism documentation for the issuance of a building permit if (a) it provides the legal, technical and economical regime of the targeted land and (b) the envisaged project is compatible with the regime set out thereby;

(iv)        if (a) the PUG does not provide the legal, technical and economical regime of the targeted land or (b) the envisaged construction is not compatible with the rules set out by the PUG for the targeted land or (c) there is no PUG in place (for example, it was never approved, it expired, it was cancelled in court or suspended), the developer must obtain a zonal urban plan (“PUZ”) whereby to adopt/amend the urbanism rules so that they are compatible with the project;

(v)          generally, PUGs do not regulate extra-muros land or do not establish an urbanism function/regime compatible with renewable projects;

(vi)        very recently, a new exception from the need to adopt an urbanism documentation was added in case of other specific types of constructions allowed on extra murros land.

Further to the above, PUZs are still needed for developing renewable projects on lands below 50 ha in order to establish the function and urbanism parameters of the respective land that are compatible with the envisaged project. Nevertheless, a case-by-case assessment should be made regarding the PUG rules applicable on the respective land. Such assessment should be made by the consultants of the developer, without simply relying on the assessment made by the local authorities when issuing the urbanism certificate.

 
 

PNSA

 
 

ARTICOLE PE ACEEASI TEMA

ARTICOLE DE ACELASI AUTOR


 

Ascunde Reclama
 
 

POSTEAZA UN COMENTARIU


Nume *
Email (nu va fi publicat) *
Comentariu *
Cod de securitate*







* campuri obligatorii


Articol 661 / 4300
 

Ascunde Reclama
 
BREAKING NEWS
ESENTIAL
SCA Bondoc si Asociații anunță cu mare tristețe trecerea în neființă a colegului și prietenului avocat Horațiu Dumitru
CMS îl promovează pe Andrei Cristescu în poziția de Counsel în cadrul biroului din România. Horea Popescu (Managing Partner): Andrei reflectă perfect valorile CMS, mai ales prin munca sa în echipă și implicarea în mentoratul colegilor juniori
Băncilă, Diaconu și Asociații SPRL a asistat Goodpack SRL, societate parte din portofoliul CEECAT Capital, în procesul de achiziție a Paccor Romania SRL
Wolf Theiss a asistat fondurile Cerberus Capital Management și Revetas Capital în legătură cu vânzarea complexului de birouri The Landmark din București. Partenerul Ileana Glodeanu a coordonat echipa multidisciplinară de avocați
Cine sunt și cum gândesc profesioniștii evidențiați de Legal 500 în GC Powerlist Romania | De vorbă cu Ștefania Andruhovici, Directorul Departamentul Juridic - Electrica SA: „Misiunea de a promova principii sănătoase se extinde dincolo de cadrul biroului, datoria noastră fiind aceea de a fi, prin tot ceea ce facem, un exemplu pentru cei din jur”
Studiu Refinitiv | Piața tranzacțiilor de M&A crește în primul semestru din 2024. Avans de 18% la nivel global și de 39% pe piețele emergente. CMS își menține pozițiile fruntașe în clasamente, Clifford Chance și Schoenherr se remarcă în Europa și două firme cu prezență la București rămân în top la nivel global
Cel mai amplu domeniu de master din România și din istoria învățământului juridic superior românesc, la Facultatea de Drept din Universitatea București. Anul acesta vor fi 14 programe, unele derulate în colaborare cu instituții de învățământ din străinătate | Prof. univ. dr. Răzvan Dincă, decanul Facultății: “Atunci când comunicarea în domeniile la care se referă specializarea se face, din cauza caracterului lor global, în limba engleză, organizăm și noi programele în limba engleză pentru administrarea corectă a terminologiei juridice specifice”
Filip & Company a asistat AROBS la cea mai mare operațiune de majorare de capital a unei companii de tehnologie listată la BVB. Olga Niță, partenerul care a coordonat echipa de proiect: ”Operațiunea nu doar că subliniază angajamentul față de creștere și inovație, dar contribuie semnificativ la dezvoltarea și consolidarea pieței noastre de capital”
RTPR alături de Global Records, compania independentă de top de muzică dance din CEE, la semnarea parteneriatul strategic cu Believe, una dintre cele mai importante companii de muzică digitală din lume
RMGC a pus deoparte 1,5 milioane de dolari pentru anularea deciziei în litigiul tranșat în favoarea României și pentru recuperarea costurilor generate de procedura de arbitraj | Cererea de anulare a fost depusă la secretarieatul ICSID. Compania vrea să lupte în instanță și pentru licența de exploatare de la Roșia Montană, anulată de ANRM luna trecută
Popescu & Asociații își extinde echipa de profesioniști și anunță cooptarea în structura de conducere a avocatului Bogdan ILEA, fost secretar de stat în Ministerul Justiției, care va coordona practica de Regulatory, Government & Public Affairs | Octavian POPESCU, Managing Partner: ”Profesionalismul și dedicarea sa sunt aliniate perfect cu valorile noastre”
Filip & Company a asistat Banca Transilvania în tranzacția de securitizare sintetică cu Banca Europeană de Investiții și Fondul European de Investiții
 
Citeste pe SeeNews Digital Network
  • BizBanker

  • BizLeader

      in curand...
  • SeeNews

    in curand...